Warehouse & inventory

Reorder point calculator

Calculate the stock threshold for the next order.

Inputs

Use decimal comma or point without thousands separators. All quantities must use the same unit.

Enter zero explicitly as 0. Empty fields are not treated as zero.

Your result

Enter values or load an example, then calculate.

Formula & assumptions

Reorder point = daily demand × replenishment lead time + safety stock

Demand and replenishment lead time must use the same day basis, such as calendar or working days. Assumes constant demand and full replenishment lead time. Compare inventory position (stock + open receipts − open demand) with the reorder point to make an order decision; this is not an order quantity.

Display values are rounded; calculations use no intermediate rounding. Adjust results for indivisible quantities, pack sizes and operational requirements.

Method reference: Oracle Inventory: Reorder Point Planning.

Article planning · CSV, history & scenarios

Maintain a shared article dataset, calculate all articles and transfer it explicitly to another calculator. Data stays in this open page; no background saving.

1. Article data

periods contains quantities for equal-length periods in chronological order. Annual demand is a separate field and is not extrapolated automatically.

2. Model options

Your article plan

Import CSV or create an article. Then complete model options and calculate all articles.